1  Installation Requirements 

The installation position of the swing barrier turnstile depends on its size. A distance of 100mm between 
the  swing  barrier  turnstile  and  the  wall  needs  to  be  reserved  for  ease  of  opening  the  top  cover  of  the 
machine to perform maintenance and adjustment. The reference figure is shown below:

2  Installation Position 

It is recommended that the swing barrier turnstile must be installed on a horizontal solid platform 
with a height of 50mm to 100mm.

1.

After installation, check if the connection is done correctly at the connecting points of the ground 
wire, at the connector assemblies and wiring points of the circuits, as well as at each movable part 
of  the  swing  barrier  turnstile.  Any  loose  nuts,  screws  and  other  fasteners  should  be  tightened  in 
time to avoid any failures caused by long-time operations. 

4.

3.

Make sure the ground wire of the system is reliably connected to avoid personal injuries or other 
accidents.

2.

It  is  also  recommended  that  the  swing  barrier  turnstile  should  not  be  used  in  the  corrosive 
environment.

Summary of Contents for Mars-B1011

Page 1: ...ies Due to regular upgrades of systems and products ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual Version 1 0 Applicable Models Mar...

Page 2: ...tal solid platform with a height of 50mm to 100mm 1 After installation check if the connection is done correctly at the connecting points of the ground wire at the connector assemblies and wiring poin...

Page 3: ...the device size and the screw hole A Electric Drill To drill holes according to the marked screw holes A Wrench To secure the M12 expansion screw on the device 4 Installation 1 Place the turnstile to...

Page 4: ...4 Installation Remove the screws xing the top lid and remove the top lid 2 3 Remove the side lid that hang on the device 3...

Page 5: ...4 Mark the oor following the periphery of the legs 4 710 00 120 00 120 00 1253 00...

Page 6: ...the electric drill according to the drawn screw holes 5 5 6 Clean up the soil and dust after the drilling is completed place the turnstile to the installation site again Insert the M12 expansion scre...

Page 7: ...he device 6 9 It is recommended that a warning line be marked on the ground after installing the device so as to prompt the pedestrian to stand behind the warning line when veri cation 100 00 180 00 1...

Page 8: ...7 10 If you need to assemble the swing arm by yourself please refer to the diagram below for installation Note The swing arm is already installed in the factory...

Page 9: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com...

Reviews:

Related manuals for Mars-B1011