this  full  height  turnstile  is AC100-120V/200-240V. The  PVC conduits  are  buried  100mm 

below the ground, with the height of the exposed part not not less than 100mm. To prevent 

water leakage to the conduit, the conduit mouth needs to be bent back. 

FHT2300&FHT2400 series installation holes are as shown in Figure 2-3A and Figure 2-3B. 

 

 

 

 

Figure

2-3A 

Figure

2-3B 

Ø25 PVC pipe 

Ø25 PVC pipe 

Summary of Contents for FHT2300

Page 1: ...Full Height Turnstile User Manual Applicable Models FHT 2300 2400 Version 1 2 Date Mar 2019...

Page 2: ...trol system 2 1 5 The working principle of full height turnstiles 3 1 6 Product related parameters 3 Chapter 2 The Installation of the Device 4 2 1 Installation notes 4 2 2 Installation position of th...

Page 3: ...wo KR101E reader InBio260 with two FR1200 ID reader FHT2300 FHT2311 FHT2322 FHT2400 FHT2411 FHT2422 1 2 Structures and dimensions FHT2000 series has stainless steel casing which provides corrosion res...

Page 4: ...re mainframe box 1 4 Electronic control system The electronic control system of the full height turnstile is composed of reader control panel access controller direction indicator horn and transformer...

Page 5: ...fter the access controller send the signals to the control panel the control panel will send out a pass 1 5 3 After receiving the signal from the access controller the control panel sends signals to t...

Page 6: ...cidents 2 1 4 After completion of the installation check the connection condition of earth wire connector assembly for connecting line and all moving parts with the device Make sure the connection is...

Page 7: ...elow the ground with the height of the exposed part not not less than 100mm To prevent water leakage to the conduit the conduit mouth needs to be bent back FHT2300 FHT2400 series installation holes ar...

Page 8: ...screw and fix it After that the mainframe box is fixed on the frame Finally install the whole rotating part in the middle of the frame as shown in Figure 2 3C Figure2 3C After fixing the device open...

Page 9: ...7 Figure 2 3D...

Page 10: ...n mechanism Check and tighten others connection parts 3 3 Power maintenance Cut off power supply before maintenance Check whether the plug is loose if loose it needed to tightly it Please do not repla...

Reviews:

Related manuals for FHT2300