Take the frame aside and use the electric drill according to the drawn screw and wiring holes.
2.
3.
Clean up the fragments and dust after drilling, then place the frame on the installation site again. Check
whether the drilled holes corresponds to the mark on the device.
4.
User must pull the power cable and Ethernet from the machines and put them into the wire slot.
①
②
φ
25mm
PVC pipe
Tether Cable
Power Cable
Ethernet
5
The input voltage for this full height turnstile is AC100-120V/200-240V. The PVC conduits are buried 100mm below
the ground, with the height of the exposed part not less than 100mm. To prevent water leakage to the conduit, the
conduit mouth needs to be bent back.
Note:
Summary of Contents for FHT2300
Page 10: ...9 Bottom Top Front...