Assemble the Gate Frame
Slide the bottom and top horizontal rails (please note the
difference) down over the two vertical rails as shown.
Note that the underside of the bottom rail only has two holes
as shown.
Align the pre-drilled holes in the horizontal rails with the
pre-drilled holes in the vertical rails and fasten together with
TWO short screws for the bottom rail and ONE screw for the
top rail. Leave the last pre-drilled hole empty for now (as
illustrated) as it’ll be used for installing the latch finger at a
later step.
Starting with one inside corner, place the corner bracket
against the horizontal and vertical rails as shown.
Fasten corner bracket with two short screws into the horizontal
rail.
Fasten with two more screws into the vertical rail.
Repeat for all four inside corners.
1
2
STEP ONE
1
3
2
3
3
Manchester Vinyl Picket Gate Instructions
Note: Underside of bottom rail.
4
5
6
Align
4
5
Note: Do Not Install This
Screw Until Later