TRANSPORT
ZIPPER MASCHINEN GmbH www.Zipper-Maschinen.at
27
ZI-WP400TN
13
TRANSPORT
For proper transport, follow the instructions and information on the transport packaging regarding
centre of gravity, attachment points, weight, means of transport to be used and prescribed
transport position, etc.
Transport the machine in its packaging to the place of installation. When lifting, carrying and
depositing the load, make sure that you are in the correct posture:
Lifting, Depositing
Ensure stability when lifting / setting down (legs hip width).
Lift / lower load with bent knees and straight back (like weightlifter).
Do not lift / lower the load jerkily.
Carrying
Carry load with both hands as close to body as possible.
Carry load with straight back.
14
ASSEMBLY
14.1
Checking scope of delivery
Check the machine immediately after delivery for transport damage and missing parts.
14.2
The workplace
Choose a suitable place for the machine. Pay attention to the safety requirements and the dimen-
sions of the machine. The selected location must ensure a suitable connection to the electrical
supply. Make sure that the machine is placed on a solid and level surface and that the ground can
support the load of the machine. The machine must be levelled at all support points. It is also
necessary to guarantee a distance of at least 0.8 m around the machine. The necessary distance
for the feeding of long workpieces must be provided.
Anchoring on level ground
Use four bolts to secure your machine to the ground.
Due to the different ground conditions, these are not
included in the delivery content. Select the correct
bolt type for your soil conditions.