Quick Start Installation Guide
807118 v1.00 01.21 G5 BC Quick Start Guide
17
SECTION 10: Connect the Booster
Booster
Booster
Hold connections
with spanner
while tightening hoses
3/8" BSP
connections
!
Do not connect to electrical power until commissioning.
Do not over tighten hose connections.
Braided hoses supplied cannot be lengthened.
!
Strainer
Cold water into Booster,
connect to Command Centre
BYPASS OUT
see pages 19,20
Hot water out of Booster,
connect to Command Centre
BYPASS IN
see pages 19,20