801910 - Zip Sparkling HydroTap - Installation Instructions - July 2014 - V1.00
Page 21 of 40
Ventilation
=
=
m
ax
4
3
314.00
12.00
12.0
0
285.00
12.0
0
5
326.00
CUT OUT DETAILS
A
A - KICKBOARD CUT-OUT
1.Drill 4 pilot holes Ø12 in corners
2.Finish cut-out using Jigsaw
and Keyhole or Wall Board saw
B - CABINET FLOOR
CUT-OUT
1.Drill two pilot holes Ø12
2.Finish cut-out using Jigsaw
C - CABINET FLOOR
CUT-OUT
1.Drill 4 pilot holes Ø12 in corners
2.Finish cut-out using Jigsaw
and Keyhole or Wall Board saw
ATTENTION:
Insure that: Cut outs 'A' and 'B' are on opposite side of cabinet.
Cut out 'C' is straight behind'A'
60
.0
0
B
C
12.00
45.00
2
8
4
2.4
The following instructions are critical if the vent kit, as supplied,
is not fitted:
If the kick board vent kit cannot be used then it is important to fit a standard HydroTap vent kit, which ensures
heat dissipation through natural convection via installed vents. For high use applications, where the cupboard
space temperature is near 35°C, or higher, an auxiliary ventilation kit must be fitted. (Contact your local
service centre for availability).
Note:
The vent kit has to be installed in a way that allows air to be drawn in from the bottom of the cupboard
and expelled through the top of the cupboard. Therefore placement of the outlet vent should be towards the
top of the door (Option 1) or on the side of the cupboard (Option 2).
Min 450mm
For positioning of cutout C
use the template marked on the cardboard carton
Side outlet vent
(Option 2)
Door outlet
vent
(Option 1)
Front inlet vent
Cool Air IN
Warm Air OUT
Typical airflow
for BCS with no
kickboard venting