background image

Page 4 of 12

Zip Hydroboil - Installation & Operating Instructions - 81446 - February 2005

Read These Warnings First

Please read all installation requirements, installation procedures and
precautions before installing any Zip Hydroboil instant boiling water heater.

Never attempt to install any Zip Hydroboil instant boiling water heater without
reading all of the applicable instructions.

In some hard water areas where mineral scale accumulation in the boiling
chamber of the Zip Hydroboil may become a problem, consideration should be
given to the maintenance required. A suitable form of water treatment may be
necessary.

All plumbing connections must be made in accordance with local regulations.

The Zip Hydroboil instant boiling water heater is not intended for use by young
children or infirm people without supervision.

Young children should be prevented from having access to ensure that they are
not able to use or play with the heater.

If the installation site is located more than 1000 metres above sea level, the
installer should contact a Zip authorised agent for high altitude settings.

This appliance must be earthed. If the power supply cord is damaged it must
be replaced by a Zip authorised agent or a qualified electrician.

Do not remove the cover of the heater under any circumstances without first
isolating the heater from the power supply.

Do not use strong, corrosive or abrasive cleaners to clean the case of the
heater.

Frost protection: If this heater is located where ambient air temperature could
fall below 5ºC when the heater is not in use, do not turn off the appliance
electrically. This safeguard does not offer the same protection to the connecting
pipework and fittings.

The ambient temperatures this unit should operate within are 5ºC - 50ºC.

This heater is intended only for indoor use and should never be installed
outdoors or be exposed to the elements of nature.

This unit must not be positioned in an area that may be cleaned by a water jet.
This unit must not be cleaned by a water jet.

Before installing, ensure that the following are available:

a) Sufficient space to position the heater so there is at least 150 mm 

clearance above the heater for service access, 65 mm to its left and 
20 mm to its right – the tap outlet usually should be positioned at least 
200 mm above a draining board or drip tray.

b) Power supply connection to the heater via a double pole fused spur with a

minimum break rating that adequately covers the maximum power usage.
For units with 3.6 Kw element (25 ltr) or multi element units (40 ltr) an
isolating switch in the fixed wiring and attached to a secure surface is
required. This switch must provide all-pole disconnection and a contact
seperation of at least 3 mm installed in accordance with wiring rules.

c) Cold water supply with a minimum working pressure of 1 bar and a

maximum working pressure of 7 bar connected via an isolation valve.

d) Outlet drainage to a sink draining board or to a drip tray.

Installation Requirements

Summary of Contents for Hydroboil 01511

Page 1: ...re White 01511 Zip Hydroboil 1 5 Litre Stainless Steel 03512 Zip Hydroboil 3 Litre White 03511 Zip Hydroboil 3 Litre Stainless Steel 05512 Zip Hydroboil 5 Litre White 05511 Zip Hydroboil 5 Litre Stain...

Page 2: ...Page 2 of 12 Zip Hydroboil Installation Operating Instructions 81446 February 2005...

Page 3: ...and relevant local authority by laws Contents Read These Warnings First 4 Installation Requirements 4 Installation Procedures 5 Step 1 Positioning 5 Step 2 Fastening 5 Step 3 Connecting 6 a Plumbing 6...

Page 4: ...ive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in use do not turn off the appliance e...

Page 5: ...ap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for service access of not less than 150 mm top 65 mm le...

Page 6: ...a waste water drain For concealed vent plumbing connect plumbing to the vent outlet from the heater rear using a capillary elbow protruding 45 mm from the wall Alternatively attach a tun dish to the...

Page 7: ...3 O L 304 5 0 L 7 5 L 65 CLEAR 56 POSITIONING PIN EXTERNAL PLUMBING ELECTRICAL WIRING POSITION INTERNAL PLUMBING 72 15 25 35 42 COLD INLET VENT BENCH TOP 318 5 O L 416 3 O L 448 5 O L 561 7 5 L 38 1 5...

Page 8: ...Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester or continuity tester of accuracy Class 5 or better Class 5 denotes...

Page 9: ...oiling water will flow until the tap paddle is released This operation gives fingertip flow control for safe filling of cups and mugs For filtered instant boiling water to fill larger vessels such as...

Page 10: ...Thermostat Kit 13 90127 Overload kit Hydroboil 2000B 14 90511 Tap Handle Hydroboil HB 15 90510 Outlet Nozzle Hydroboil 2000B 16 90503 Strap and key kit 1 5 3L 2000B 90504 Strap and key kit 5 7 5L 2000...

Page 11: ...Zip Hydroboil Installation Operating Instructions 81446 February 2005 Page 11 of 12 Spare Parts 1 2 3 4 5 6 9 26 27 24 16 14 11 10 7 25 13 15 1 12 19 8 23 9 1 20 21 17 18 9...

Page 12: ...st of removal cartage and re installation of any component of the appliance if it needs to be returned for repair to Zip or its Distributor This warranty does not cover damage resulting from non opera...

Reviews: