Page 6 of 12
Zip CH103, CH104 - Installation & operating instructions - 82127UK - June 2015 v1.04
Heavy Duty ChillTap
®
Outlet
Inlet
Chiller unit
Filter and
head
assembly
Mains cold water
15mm compression
fitting
Pressure limiting
multifunctional valve
CH103 and CH104 configuration diagram
Note
s
Ensure that the plastic pipes from the chiller unit are insulated with the
tube insulation provided, use any tube insulation left over to insulate
pipes from the filter head.
Cut pipes should not be overly long, but must allow sufficient length to
avoid stress at connection points.
CH103 ChillTap
®
installation instructions
continued
Connect the blue tube from the tap to the push fit fitting marked OUTLET on the
top left rear of the chiller unit, trim to length before fitting.
Connect the white tube (supplied in the tap kit) between the INLET connection
on the filter head (marked with arrow pointing towards the filter head) to the
pressure limiting multifunction valve, trim to length before fitting.
Use the 4off pipe clamps and 4off 1/2” self tap screws provided to secure
tubes appropriately, to prevent applying stress to pipe connections.
260mm min.