10
10.1 Installing the product
The product can be installed from multiple sides.
1
2
3
►
Insert the centering sleeves or straight pins into the provided fits on
the product.
►
Position the product on the mounting piece.
►
Mount the product on the mounting piece using the appropriate
mounting screws.
1
Mounting screw
2
Straight pins
3
Centering sleeve
10.2 Installing the energy supply
NOTICE
►
You can find the information in the technical data sheet on our website.
►
Close off unused connections using pressure-resistant closures.
►
The authorized connections that are available can be found in the accessories list on our website. The
necessary ordering information can also be found there.
►
Use compressed air in accordance with DIN ISO 8573-1 [4:4:4].
INFORMATION
The flow control valves are already mounted and closed upon delivery. This ensures that no uncontrolled
movements take place.
The figure shows the delivered state of the product. Several connections
are available for the energy supply.
►
If using the alternative connections, close off the connections
pictured with corresponding grub screws.
1
1
Flow control valve
Zimmer GmbH • Im Salmenkopf 5 •
77866 Rheinau, Germany •
+49 7844 9138 0 • www.zimmer-group.com
INSTALLATION AND OPERATING INSTRUCTIONS:
SWM1000
DDOC00964 / a
EN / 2023-01-13
Summary of Contents for SWM1000 Series
Page 2: ......