![Zhumell Vista 25x100 User Manual Download Page 4](http://html1.mh-extra.com/html/zhumell/vista-25x100/vista-25x100_user-manual_3679183004.webp)
I
NSTALLATION
Mount the pier base on stable, level ground using the included
mounting bolts. Anchor bolts into concrete or steel base which is
either anchored securely to the ground or a minimum of 10’ in diame-
ter to ensure stability. If improperly mounted, the unit may tip.
B
ASE
I
NSTALLATION
Mount pier to base by inserting raised ring on pier into base open-
ing and securing with M10X20 mounting bolts (included) through
pre-drilled holes. Tighten bolts to ensure stability.
Secure base to mounting platform where unit will be used. (See
base installation below)
Attach mounting plate to top of control box with raised ring fac-
ing up. Secure mounting plate to control box using M2.5X5 hex
bolts (included). Tighten bolts to ensure stability.
Mount binoculars by setting them atop the mounting plate so
that mounting plate ring is centered in recess on the binocular
base and control cord enters the control box through the center hole
of the mounting plate. Attach binoculars to mounting plate using
M6X20 bolts (included). Tighten bolts to ensure stability.
Thread shutter control cable from binoculars onto shutter connec-
tion being careful not to bend connection prongs.
ASSEMBLY
1
2
3
4
5