ADJUSTMENTS AND TESTS [AT DOCK]
Page 44
7.0 ADJUSTMENTS AND TESTS (SECURED TO DOCK)
7.1 C
ONTROL
H
EAD
(E
NGINES
S
TOPPED
)
A)Turn the power ON to the control system.
B)The Control Head at each station will produce an intermittent
tone.
C)Take command at a remote station.
D)Perform each of the following steps on all Control Heads.
1. Move each Control Head lever full Ahead and full Astern. Ensure Processor reacts to
lever movement.
2. Place the Control Head levers in the Neutral detent position.
3. Depress and hold the station transfer button.
4. Move the Control Head levers to the Ahead detent position before releasing the trans-
fer button.
5. The red indicator light on the Control Head should blink, indicating CruiseCommand
has been placed in Warm-up Mode. Warm-up Mode only operates in the Ahead direc-
tion.
• If the red indicator light blinks, continue with Control Head testing
• If the red indicator light does not blink, check connections as stated in Section 5.3.
7.2 S
TART
I
NTERLOCK
(E
NGINES
S
TOPPED
)
A)Turn the CruiseCommand DC power OFF.
• Verify that the engine(s) will not start.
B)Turn the CruiseCommand DC power ON. Do not take command
at a Station.
• Verify engine(s) will not start.
C)Take command at a Station. Place the Control Head lever(s) to 50
percent throttle.
• Verify engine(s) will not start.
D)Place the Control Head lever(s) in the Neutral/Idle (vertical) posi-
tion. Take command at a Station.
• Verify engine(s) will start in this position.
WARNING: Turn OFF the control system power before disconnecting from the batteries. Do not
disconnect battery terminals when engine is operating.
NOTE: This will check that the Control Head is operating. * On Twin Screw applications ensure
the Port Control Head lever operates the Port Processor and the Starboard Control Head
lever operates the Starboard Processor. *
NOTE: If any of the following tests fail, verify Start Interlock Installation and Start Interlock con-
nections as shown on the Drawing in Appendix C-1 and in Section 5.2.2.
Summary of Contents for CruiseCommand 785CE
Page 71: ...APPENDIX A 1...
Page 72: ......
Page 74: ...Appendix A 7 01 Page 2...
Page 77: ...Page 5...
Page 78: ...Page 6...
Page 82: ...Page 10...
Page 84: ...Page 12...
Page 86: ...Page 14...
Page 87: ...Page 15 Deutsch Connector Assembly...
Page 88: ...Page 16...
Page 89: ...Page 17...
Page 90: ...Page 18...
Page 94: ...Page 22...
Page 97: ...APPENDIX B 1...
Page 98: ......
Page 150: ......
Page 151: ...APPENDIX C 1...
Page 152: ......
Page 153: ...Page 3 Drawing 11748 Single Screw Two Stations...
Page 154: ...Page 4...
Page 155: ...Page 5 Drawing 11746 Single Screw Two Pluggable Stations...
Page 156: ...Page 6...
Page 157: ...Page 7 Drawing 11747 Twin Screw Two Stations...
Page 158: ...Page 8...
Page 159: ...Page 9 Drawing 11745 Twin Screw Two Pluggable Stations...
Page 160: ...Page 10...