Commissioning Test Sheet 
Residential - String Inverter 

 

 

 

CTS1039-PV-v4 

Page 1 of 1 

 

solarcity PV array commissioning sheet 

 

Address of installation  

 

 

 

 

 

 

 

 

 

 

 

COC Reference/Certificate ID Number  

 

 

 

 

 

 

 

 

  

Date of Testing  

 

 

 

 

 

 

 

 

 

 

 

 

 

Number of PV modules in string 1  

 

 

 

 

 

 

 

 

 

 

Number of PV modules in string 2 (if applicable)  

 

 

 

 

 

 

 

 

Number of DC optimisers (if used)    

 

 

 

 

 

 

 

 

 

Continuity 

Earth continuity 1 – Earth busbar to earth rod (MEN link removed)    

 

 

 

 Ω 

Earth continuity 2 – Main earth conductor to array frame  

 

 

 

 

 

 Ω 

Polarity check and PV open circuit voltage 

 

Polarity 

Voltage (V) 

String 1 

 

 

String 2 (if applicable) 

 

 

PV array at switch disconnector 

 

 

Insulation resistance measurements 

Array positive to earth  

 

 

 

 

 

 

 

 

 

 MΩ 

Array negative to earth  

 

 

 

 

 

 

 

 

 

 MΩ 

System Operation 

PV operating voltage   

 

 

 

 

 

 

 

 

 

 V 

PV operating current – string 1  

 

 

 

 

 

 

 

 

 A 

PV operating current – string 2 (if applicable)  

 

 

 

 

 

 

 A 

PV array switch-disconnector operating correctly under load  

 

 

 

YES / NO 

Time of day    

 

 

 

 

 

 

 

 

 

 

 

 

Sunlight/irradiance at time of testing   

 

 SUNNY / CLOUDY – BRIGHT / CLOUDY - DARK 

 
 

Summary of Contents for Zeverlution 2000S

Page 1: ...2 BEHAVIOURAL 2 SAFETY 2 INSTALLATION PROCEDURE 3 String Design Guidelines 3 5 1 1 String Layout Without Optimisers 3 5 1 2 String Layout with Optimisers 3 5 1 3 Shading 3 5 1 4 Maximum String Voltage...

Page 2: ...d electrical part of the inverter installation instruction The focus of this SOP lies on the physical installation of Zeverlution 2000s and Zeverlution 4000 inverters and any associated switch gear DC...

Page 3: ...4000 inverters and for arrays with or without optimisers the minimum and maximum strings lengths are as follows minimum number of modules per string is 3 maximum number of modules per string is 10 5 1...

Page 4: ...systems with a peak output between 1 5kWp and 3kWp 6 to 10 modules where the peak performance rating per panel at STC does not exceed 295Wp For further details please refer to the Zeverlution 2000s da...

Page 5: ...et which is used to fix the units to a suitable wall Please refer to the solarcity wall cladding guide for suitable wall claddings to mount the inverter on 1 Use the wall bracket as a drilling templat...

Page 6: ...ble The inverter must not be installed in a location where it is exposed to direct sunlight Wiring 5 3 1 DC Wiring All wiring must be installed and sized in accordance with the relevant requirements o...

Page 7: ...ted as per AS5033 The table below shows the maximum cable length one way between array and inverter with JA 290W panels allowing for a 2 voltage drop Panels per string 3 4 5 6 7 8 9 10 Max cable lengt...

Page 8: ...to maintain the correct polarity the connectors are also marked with and symbols The steps below explain how to assemble SUNCLIX connectors Ensure that the array cable is de energized before installin...

Page 9: ...lled on an appropriate roof penetration kit must be used Roof penetrations must always be located under the solar panels where an attic space is accessible for the cable run Where cable s pass through...

Page 10: ...mm which is usually too short for leapfrog wiring Please use standard daisy chain wiring for all optimised array sections 5 3 3 AC Wiring The inverter is connected to the switchboard using double insu...

Page 11: ...S 5033 2014 and follow the instructions outlined in the standard Attached to this document you ll find a commissioning sheet which you may use to record the test results A completed and signed copy of...

Page 12: ...To confirm wait for approximately 10 seconds until the inverter automatically returns to the initial display showing the error code Connecting the inverter to the Internet The inverter needs to be co...

Page 13: ...before setting up the WIFI connection 2 With the inverter powered up use a smartphone or laptop to search for the inverter s wireless access point This will display as ZEVERSOLAR XXXX Connect to this...

Page 14: ...omer s wireless network 6 After approximately one minute the inverter should connect to the customers wifi network and the status indicator on the wireless page will show a green tick 7 Take a photo o...

Page 15: ...rnet cable through the comms gland on the bottom of the inverter ensuring that the cable entry is sealed from dust and moisture 3 The inverter automatically obtains an IP address from the router via D...

Page 16: ...rod MEN link removed Earth continuity 2 Main earth conductor to array frame Polarity check and PV open circuit voltage Polarity Voltage V String 1 String 2 if applicable PV array at switch disconnect...

Reviews: