Three Phase Inverter – Grid Code Set-Up 

1.1

 

Introduction 

This standard operating procedure (SOP) details the steps that are required to change the default grid 
code setting of a Zeversolar three phase inverter. 

 

1.2

 

Assumed Knowledge 

This guide assumes the following: 

 

A Zeversolar three phase inverter has been installed; 

 

The installation manual has been read and fully understood. 

 

1.3

 

IMPORTANT – CHECK GRID CODE SETTING DURING COMMISSIONING! 

The grid code setting should be checked during the commissioning of a PV plant. It is essential to 
ensure  that  the  correct  grid  code/safety  setting  has  been  selected  for  the  relevant  region.  Each 

Zeversolar inverter is set to a default grid code which is based on the serial number suffix that can 

be found on the label affixed to the inverter and its packaging, see Fehler! Verweisquelle konnte nicht 

gefunden werden. below. 

 

Figure 1 - Serial Number with UK Suffix 

Inverters  shipped  to  Europe  have  three  distinct  suffixes  and  as  such  the  default  grid  code  is  set 

accordingly, please see Table 1. 
 

S/N Suffix  Default Grid Code 

DE 

VDE-AR-N-4105 

UK 

G83/2 or G59/3 

NL 

NEN 50438 

Table 1 - Default Grid Code Settings 

Therefore it is 

necessary

 to check the serial number suffix and ensure that the correct grid code is 

set. For example, an inverter being installed in the UK may have the DE suffix, in this case the inverter 

grid code should be changed from the “VDE-AR-N-4105” grid code to the relevant UK grid code “G83/2 
or G59/3.” 

 

 

Summary of Contents for Evershine TLC

Page 1: ...Grid Evershine TLC Eversol TLC Zverlution Pro 33K Code Setup Guide Three Phase Inverter...

Page 2: ...ter Grid Code Setup Guide Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 221 800 515...

Page 3: ...id Code Set Up 4 1 1 Introduction 4 1 2 Assumed Knowledge 4 1 3 IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING 4 1 4 When is Changing the Grid Code Required 5 1 5 Hardware Requirements 5 1 6 B...

Page 4: ...Grid_Code_3_Phase_Inv_Rev1_20160510 3...

Page 5: ...the relevant region Each Zeversolar inverter is set to a default grid code which is based on the serial number suffix that can be found on the label affixed to the inverter and its packaging see Fehl...

Page 6: ...and Republic of Ireland Switzerland Turkey Please note please refer to the Certificate Overview available from the Zeversolar website to determine for which regions the Zeversolar inverters are certif...

Page 7: ...front panel 2 When then Menu screen is displayed highlight Settings and press the Enter button 3 On the Settings screen select Advanced Settings and press the Enter button 4 On the Password screen ent...

Page 8: ...ect grid code is selected press the enter button repeatedly to scroll through to the end of the parameter list 8 When the entire parameter list has been scrolled through the Safety screen will display...

Page 9: ..._3_Phase_Inv_Rev1_20160510 8 1 8 Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 221...

Reviews: