PREMIER QUATRO USER MANUAL, MAINTENANCE GUIDE & LOG BOOK (Fyreye MKII)
#Doc No. GLT-215-7-2
PAGE 5
Issue: 1.08 Author: TE/NJ Date: 26/05/2017
Annual Test (to be carried out by authorised service personnel only)
Check every detector, call point, sounder and all auxiliary equipment for correct operation.
Check Switch Mode cage INPUT Voltage (30.5 VAC), Charger Voltage (27.6V off load, adjusted with VR1) & Battery Voltage
(25-27V)
Every Five Years (to be carried out by authorised service personnel only)
Carry out a complete wiring check in accordance with the testing and inspection requirements of the relevant National
wiring regulations (in the UK this is the IEE Wiring Regulations). The Batteries should be replaced because SLA batteries
have a working life of 5 years.