Please take a few moments to check all pack contents listed.
Assembly requires 2 persons.
Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit
required in order for you to drill all screw holes before construction.
Square Potato Planter is now complete.
2
1
1.
Interlock Side Panels A (battens innermost) and fix through battens using 8no
60mm screws (2no per corner). (See Fig. 1)
2.
Place Base Panel B onto planter assembly and fix through battens using 4no
60mm screws (2no per batten). (See Fig. 2)