background image

Please take a few moments to check all pack contents listed. 

Assembly requires 2 persons. 

Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit 

required in order for you to drill all screw holes before construction.

Square Potato Planter is now complete.

2

1

1.

Interlock Side Panels A (battens innermost) and fix through battens using 8no 
60mm screws (2no per corner). (See Fig. 1)

2.

Place Base Panel B onto planter assembly and fix through battens using 4no 
60mm screws (2no per batten). (See Fig. 2)

Reviews: