background image

Please take a few moments to check all pack contents listed on page 1 of the 
Assembly Instructions. 

Please contact “Zest4Leisure” directly if any of the pack contents are damaged 
or missing. Contact telephone: 01352 752 555 Option 1 or email: 
[email protected] 

Assembly requires 2 persons. All screw holes to be pre-drilled. 

Tools required: Corded / Cordless Drill, Pozi-drive Bit / Screwdriver, 3mm Drill 
Bit. 

Shrewsbury Planter is now complete. 

1.

 

Position End Panels (A) on Side Panel (B) as shown in Fig 1a. Fix together using 
3no 55mm screws per corner (Fig 1b). Place assembly on a flat surface, position 
and fix remaining Side Panel as shown in Fig 1c & 1d. 

 

 

 

2.

   Locate Base Panel (C) as shown in Fig 2a. Attach using 8no 55mm screws as 

shown in Fig 2b (4no per long side).  

 

Reviews: