
Please take a few moments to check all pack contents listed.
Assembly requires 2 persons.
Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit
required in order for you to drill all screw holes before construction.
Scafell Pike Obelisk is now complete.
1.
Align two Trellis Panels A as shown in Fig.1a. Ensuring that screw holes
are positioned in overlap of horizontal batten (See arrows Fig.1a) and
horizontal battens face outwards, attach panels using 3no 30mm screws
(Figs.1b, 1c & 1d). Repeat procedure to attach subsequent panels to form
an obelisk.
2.
Locate Cap (B) into top of obelisk and fix in position using 4no 30mm
screws (Figs.2a & 2b)