background image

Please take a few moments to check all pack contents listed.  

Please contact “Zest4Leisure” directly if any of the pack contents are damaged 

or missing. Contact telephone: 01352 752555 option 1

 

or email: 

[email protected] 

Assembly requires 2 persons. All screw holes to be pre-drilled. 

Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit, 

Tape Measure. 

Katja Arch is now complete. 

1.

Insert 3no. Dowel Rods B into Arch Section A (Fig 1a). Locate further Arch 
Section A onto Dowel Rods B and tap into position (Figs 1b & 1c). 

        Repeat procedure for remaining Dowel Rods B & Arch Sections A 

 

 

2.

Attach 1no. Board C to each end of arch assemblies using 16no. 50mm Screws 

– 

4no per board (Fig 2a). 

        With arch assemblies positioned as shown in Fig 2b, fix together using 6no. 

25mm screws (Fig 2b). 

 

3. 

Ensuring correct orientation of Post Assembly D (see Fig 3a), position centrally to 
underside of arch assembly and fix using 4no 50mm Screws 

– 2no per post 

(Figs.3a & 3b).  

 

Repeat procedure for remaining Post Assembly D. 

 

Reviews: