Zest 4 Leisure Hanging Flower Bell Assembly Instructions Download Page 3

Hanging Flower Bell Assembly Instructions 

N.B.

 All screw holes 

must

 be predrilled.  

It is recommended that elements A1 & A2 of this product be soaked in water for 2 
hours prior to assembly. 

 

1. 

Position Long and Short Laths A1 & A2 alternately around Base B (Fig.1a), slide on 

Collar C and fix laths in position using 8no Pins 

– 1no per lath (Fig.1b). 

Fix Collar C in position using 4no 30mm Screws (Fig.1c). 

2. 

Assemble Ring Sections D as shown in Fig.2a to form a ring, ensuring slots are 

outermost (Fig.2b). Fully tighten nuts at this stage. 

3. 

Position ring assembly as shown in Fig.3.

  

4. 

Bring Laths A1 together around Finial E (Fig.4a), secure in position using Collar C 

and 4no 30mm Screws (Fig.4b). Further fix Laths A1 using 4no Pins (Fig.4c) 

5. 

Insert Screw Eye into top of Finial E (Fig.5)  

Assembly requires 2 persons.  

Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, Hammer

. 3mm Drill Bit 

required in order for you to drill all screw holes before construction.  

Hanging Flower Bell is now complete. 

Reviews: