Please take a few moments to check all pack contents listed.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752555 option 1 or email:
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit.
Cheltenham Arbour is now complete.
1.
Set out Side Panels A and Back Panel B as shown in Fig.1a and fix together using 6no
60mm Screws
– 3no per side (Fig.1b)
2.
Place Front Panel (C) between the Side Panels A (Fig.2a) and fix in position using 4no
60mm Screws
– 2no per side (Fig.2b).
3.
Locate Floor Panel D on to the floor support battens (Fig.3a) and fix to the floor battens
using 4no 60mm Screws
– 2no per side.
4.
Position the Seas Hinged Assembly E on to the seat support battens (Fig.4a) and fix to
the seat support battens using 4no 60mm Screws
– 2no per side of rear section of the
Hinged Seat Assembly E (Fig.4b).
5.
Position Seat Back Rest F between the Side Panels A (Fig.5a). Attach to the Hinged
Seat Assembly E using 2no 60mm Screws
– 1no per side (Fig.5a) and to the Side
Panels A using 2no 60mm Screws
– 1no per side (Fig.5b)
6.
Attach Trellis Back Panel G to the Middle Back Panel H using 2no 40mm Screws
– 1no
per side (Fig.6a).
Attach trellis and middle back panel assembly to the Back Panel B using 3no 40mm
Screws
– 1no per corner and 1no in the middle (Fig.6b).
7.
Fix together 2no Fascia Boards J using 1no 60mm Screw. Repeat process for the
remaining 2no Fascia Boards J.
Set the Roof Panels K as shown in Figs. 7b & 7c ensuring the outermost corners of
the Roof Panels K are flush to the top edges of Fascia Boards J (Figs.7b & 7c).
Attach Fascia Boards J to Roof Panels K using 12no 50mm Screws
– 3 per Fascia
Board J (Fig.7d).
8.
Place roof assembly on to Side Panels A (Fig.8a) and fix to the Side Panels A through
Fascia Boards J using 4no 60mm Screws
– 1no per Fascia Board. Further attach the
roof assembly to the Trellis Back Panel G through the Fascia Boards J using 2no
50mm Screws
– 1no per rear Fascia Board J.
9.
Attach the Ridge Capping L to the top of Roof Panels K using 6no 40mm Screws
– 3no
per panel (Fig.9).
10. Position and attach centrally, 2no Pointed Finials M to the Fascia Boards J (front and
back) using 4no 40mm screws
– 2no per finial (Fig.10)