- Make 4, holes in the ceiling and drive in
(3) screws without completely tighte-
ning them. Pay attention not to insert
the screw into the hole marked with
an X on the hole template.
6. Lift the hood assembly to the cei-
ling and align the top support fra-
me with the (3) screws previously
installed in the ceiling.
- Rotate assembly slightly clockwise to lock in place. Fig.7A. Drive in the fourth
screw and tighten the remaining 3 screws to secure the structure in place.
Fig.7B
7. Secure the two
upper duct covers
to support frame
with (4) screws. Fig.8
8. Secure the two
lower duct covers
parts to the support frame by overlapping the
lateral magnets. Fig.9
9. Verify that ducting from hood is connected to
ducting in the attic that will exhaust air out of
the home.
- 3 -
Summary of Contents for Z1C-00VL
Page 6: ...DUCT COVER EXTENSION SPECIFICATION 6 ...
Page 7: ... 7 ...
Page 8: ...3011000133700 00 ...