background image

www.zephyronline.com

through the fl ue (chimney) of fuel burning equipment to prevent back drafting. 
Follow the heating equipment manufacturer’s guideline and safety standards 
such as those published by the National Fire Protection Association (NFPA), and 
the American Society for Heating, Refrigeration and Air Conditioning Engineers 
(ASHRAE), and the local code authorities.

C.

 When cutting or drilling into wall or ceiling, do not damage electrical wiring 

and other hidden utilities.

D. 

Ducted fans must always be vented to the outdoors. 

E.

 This unit must be grounded.

 

WARNING

  - TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.

 

 

 WARNING

 - UNDER CERTAIN CIRCUMSTANCES DOMESTIC APPLIANCES    MAY 

BE DANGEROUS.

A. 

Do not check fi lters with hood working.

B.

 Do not touch the lamps after a prolonged use of the appliance.

C.

 No food must be cooked fl ambè underneath the hood.

D.

 The use of an unprotected fl ame is dangerous for the fi lters and could  cause 

fi res.

E.

 Watch constantly the fried food in order to avoid the cooking oil fl ares up.

F.

 before performing any mainteinance operation, disconnect the hood from 

the electrical service.

WARNING! 

For models AED-M90ASX and ADU-M90ASX never lean on the hood's 

body any object weighing more than 33,1lb (15kg), although evenly spread over 
the whole surface.

 The manufacturers will not to accept any responsability for eventual damages, 

because of failure to observe the above instructions. 

S

a

fe

ty instruc

tions

- 6 - 

Summary of Contents for Edge Wall AED - M90ASX

Page 1: ...www zephyronline com Layers Wall ALA M90ABX ALA M90AWX ALA E42ABX ALA E42AWX Edge Wall AED M90ASX Surface Wall ASU M90ASX ASU E42ASX Duo Wall ADU M90ASX RANGE HOOD Installation instructions...

Page 2: ...www zephyronline com HOTTE PER CUISINE Notice d utilisation Pag 27 CAMPANA EXTRACTORA Manual de utilizaci n Pag 53 CAPPA ASPIRANTE istruzioni per l uso Pag 79 2...

Page 3: ...pag 11 HOOD SPECIFICATION pag 12 INSTALLATION INTERNAL BLOWER pag 16 EXTERNAL IN LINE BLOWER PREPARATION pag 18 DUCTING OPTIONS pag 20 MOUNTING THE RANGE HOOD pag 21 POWER SUPPLY CONNECTION pag 22 MOU...

Page 4: ...to exhaust hazardous or explosive materials and vapors CAUTION To avoid motor bearing damage and noisy and or unbalanced impellers keep drywall spray construction dust etc off power unit CAUTION Plea...

Page 5: ...AREFUL TO PREVENT BURNS If the flames do not go out mmediately EVACUATE AND CALL THE FIRE DEPARTMENT B NEVER PICK UP A FLAMING PAN You may be burned C DO NOT USE WATER including wet dishcloths or towe...

Page 6: ...WORK WARNING UNDER CERTAIN CIRCUMSTANCES DOMESTIC APPLIANCES MAY BE DANGEROUS A Do not check filters with hood working B Do not touch the lamps after a prolonged use of the appliance C No food must be...

Page 7: ...ABX ALA E42AWX Duct Covers Electrical Junction Box Duct Cover Bracket Glass Light Bulbs Decorative Mesh Filters Range Hood Body List of Materials TYPE DESCRIPTION N A M4 1 1 B 1 8 x 1 4 12 C 1 8 x 2 4...

Page 8: ...ASU E42ASX Duct Cover Bracket Control Duct Covers Blower Housing Range Hood Body Glass Electrical Junction Box Light Bulbs Decorative Mesh Filters List of Materials TYPE DESCRIPTION N A M4 1 1 B 1 8 x...

Page 9: ...AED M90ASX Duct Cover Bracket Control Duct Covers Light Panel Light Bulbs Decorative Mesh Filters List of Materials Range Hood Body TYPE DESCRIPTION N A M4 1 1 B 1 8 x 1 4 12 C 1 8 x 2 4 4 D 1 4 x 2 3...

Page 10: ...Light Bulbs Control Decorative Mesh Filters Range Hood Body Light Panel Blower Housing Electrical Junction Box Duct Cover Bracket Duct Covers List of Materials TYPE DESCRIPTION N A M4 1 1 B 1 8 x 1 4...

Page 11: ...Ducting Calculation Sheet Maximum Duct Length For satisfactory air movement the total duct length should not exceed 100 equivalent feet 11...

Page 12: ...www zephyronline com front of hood side of hood top of hood Models ALA M90ABX ALA M90AWX ALA E42ABX ALA E42AWX Hood Specifi cations 12...

Page 13: ...Models ASU M90ASX ASU E42ASX front of hood side of hood top of hood Hood Specifi cations 13...

Page 14: ...www zephyronline com Models AED M90ASX 35 3 8 11 1 4 12 1 16 10 1 16 19 11 16 Wood Trim Dimensions 5 8 Thickness Hood Specifi cations front of hood side of hood top of hood 14...

Page 15: ...Models ADU M90ASX 35 3 8 11 1 4 12 1 16 10 1 16 19 11 16 Wood Trim Dimensions 1 5 8 Thickness Hood Specifi cations front of hood side of hood top of hood 15...

Page 16: ...y using a flat head screwdriver See Fig 1 2 Remove the 6 screws securing the blower plate to the blower housing and remove blower plate See Fig 2 3 Place the 6 metallic flange on the blower s air outl...

Page 17: ...ng by following the reverse instructions from step 2 then use the screws provided to complete installa tion Tot 14 type B See Fig 7 8 Connect 9 pin male molex connector from blower wire to 9 pin femal...

Page 18: ...ower plate See Fig 1 2 Detach rectangular metal plate from blower plate See Fig 2A Flip blower plate 90 degrees and attach rectangular plate to blower plate side with round knock out See Fig 2B 3 Re i...

Page 19: ...n nection in accordance with the natio nal electric code ANSI NFPA 70 1999 8 Secure cover to junction box using 2 screws Note1 A cable lock not included may be required by local codes Please review lo...

Page 20: ...spaces ceiling attics or garages All exhaust must be ducted to the outside unless using the recirculating op tion Use single wall rigid Metal ductwork only Fasten all connections with sheet metal scr...

Page 21: ...the paper template included with your hood on the wall to determine where to add the screws for mounting the hood Make sure the bottom of the template aligns with the bottom of where the hood will be...

Page 22: ...t to the cover 5 Connect the wires of the hood to those of the power supply as described Fig 11 BLACK L line WHITE N neutral GREEN YELLOW G ground A double pole switch properly rated must be installed...

Page 23: ...side the top of the chimney and observing the distance shown in Fig 12 4 Secure duct cover bracket to top of wall just below the ceiling using 2 type D screws pro vided See Fig 13 5 Place ducting from...

Page 24: ...ling using 2 type D screws provided See Fig 12 5 Place ducting from ceiling over the collar on top of the hood and secure using aluminum duct tape See Fig 14 6 Insert top duct cover into bot tom duct...

Page 25: ...hazard it is recommended to clean the filter a minimum of every 2 months or when instructed by the Metal Filter Clean indicator on the range hood controls Clean the range hood by carrying out the fol...

Page 26: ...irculating Kit ASU ZRC 00SU Replacement Charcoal Filters ALA ADU AED ASU Z0F 00AC Duct Cover Extension ALA ADU AED Z1C 00LA Duct Cover Extension ASU Z1C 00SU Wood Trim Wenge 5 8 thick AED ADW AEW 00BR...

Page 27: ...3LIK0482...

Reviews: