
Installation –
Mounting the Range Hood
13
For Mounting Under a Kitchen Cabinet (Fig 1)
1. Select preferred duct location (vertical or horizontal).
2. Begin installation by removing the fi lters (if installed).
3. Reinforce cabinet with 1”x2” wood strips if additional
strengthening is required or if cabinets are framed.
4. Temporarily position the range hood in the desired
mounting location. Measure and mark the mounting
holes, duct and electrical locations with a pencil.
5. Drill/cut out the required openings for duct and
electrical access by following the dimensions on page
8; make sure the duct opening is large enough to apply
duct tape.
6. Fasten hood onto cabinet with (4) M4 wood screws
provided.
7. Install
electrical.
8. Install duct work and duct tape.
9. Reinstall
fi lters.
10. Power up hood and check for leaks around duct tape.
duct/silver
tape
Duct
opening
cutout
Add 1x2
wood strips
electrical
Fig 1
(Shown as vertical ducting)
Summary of Contents for AK11005
Page 2: ...www zephyronline com...