12
www.zephyronline.com
1. Measure from range top to hood bottom and mark line A.
´PLQLPXPIURPUDQJHWRS
2. Plum and mark center line.
3. Mark hood height line B.
ZAN
: 18-7/16” from line A
ZSA
: 9-1/2” from line A
ZRV
: 15-7/8” from line A
ZRO
: 12-3/16 from line A
4. Mark mounting spread from C/L.
ZAN
: 8-7/8” on line B
ZSA
: 9-7/8” on line B
ZRV
: 8-15/16” on line B
ZRO
: 12-5/8” on line B
)DVWHQ0[´VFUHZVLQWRVWXGVRQOLQH%EXWGRQRWWLJKWHQDOO
the way.
Note: Wood blocking may need to be added behind the
drywall if no studs are present. Wall anchors may also be used
but check local codes for compliance. Failure to use suitable wall
anchors and screws to hold the weight of the hood could result
in personal injury or damage to the cooking surface or counter.
5HPRYHWKHDOXPLQXPPHVK¿OWHUV
7. Hang hood onto the mounting screws and hand tighten each screw.
)LJ$
8. Center and attach duct cover mounting bracket to wall just below the
FHLOLQJRUVRI¿WXVLQJ0[´VFUHZV
9. Install electrical and duct work. Seal duct work with aluminum duct
tape.
10. Power up hood and check for leaks around duct tape.
3ODFHWHOHVFRSLFGXFWFRYHUVRQWRKRRGDQGH[WHQGLQQHUWRSGXFW
FRYHUXSZDUGVDQGVHFXUHWRGXFWFRYHUEUDFNHWXVLQJ0[
VFUHZV5HLQVWDOOPHVK¿OWHUV
* If using hood in recirculating mode you must secure the air diverter
plate onto wall before installing duct work and duct covers. You will
DOVRQHHGWRLQVWDOOFKDUFRDO¿OWHUVDQGEUDFNHWV7XUQWRSDJHIRU
more details.
26” min.
CAUTION: At least two installers are required
due to the weight and size of the hood.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Cable Lock
Cable Lock
$FDEOHORFNLQJFRQQHFWRUQRWVXSSOLHGPLJKWEHUHTXLUHGE\ORFDO
codes. Check with local requirements and codes, purchase and
install appropriate connector if necessary.
Installation –
Mounting the Hood
FIG. A
Summary of Contents for Europa Savona Series
Page 2: ...www zephyronline com...
Page 21: ...19 Fan Curve Diagrams ZAN ZRV ZRO ZSA...
Page 22: ...20 www zephyronline com Fan Curve Diagrams...
Page 28: ...www zephyronline com...
Page 47: ...19 Diagrammes des courbes caract ristiques des ventilateurs ZAN ZRV ZRO ZSA...
Page 48: ...20 www zephyronline com Diagrammes des courbes caract ristiques des ventilateurs...