background image

8. Dismantling

 

Disconnect the gateway's power supply and uncouple 

the network cable from the PoE Injector.

 

8.1.  Pole mounting

 

Loosen the nuts of the mounting bracket. When doing 

so, you should always hold the mounting bracket with 

the housing. After completely loosening the nuts, you 

can pull the gateway off the u shaped mounting bracket.

 

8.2.   Wall mounting

 

First remove the bottom two screws between the 

mounting bracket and the wall. Hold the mounting 

bracket with the housing and slowly loosen and remove 

the two upper bracket screws.

 

12

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 
 

 

 

 

 

 
 

 

 

 

 

 

 

Summary of Contents for 2ACOA-OD2

Page 1: ...with nuts spring ring and washers 2x spacer sleeves for mounting bracket 2x 868 MHz LoRaWAN Antennas Network cable 5 m Cable ties 2x RJ45 connector Equipotential bonding cable 16 mm Power cord for PoE...

Page 2: ...n each side with a washer spring washer and nut Check that the gateway is stably attached to the pole ill 4 5 2 Antennas The following illustrationshows the usualarrangement and mounting positions of...

Page 3: ...Commissioning The gateway starts immediately after plugging in con necting the PoE Injector making the electrical connection 5 3 Equipotential bonding cable The potential equalization cable ground cab...

Page 4: ...ated manner Cellular network n a LoRa channel 16 channels two external antennas Frequency US 902 external 2 x LoRa antennas incl mounting bracket included in scope of delivery Antennas Housing Alumini...

Page 5: ...19 8 cm 11 0 cm 15 2 cm 11 54 9 cm 24 0 cm 31 2 cm...

Page 6: ...t When doing so you should always hold the mounting bracket with thehousing Aftercompletely looseningthenuts you can pull the gateway off the u shaped mounting bracket 8 2 Wall mounting Firstremovethe...

Page 7: ...o the US CANADA Industry Canada statement This device contains licence exempt transmitter s receiver s that comply with Innovation Science and Economic Development Canada s licence exempt RSS s Operat...

Page 8: ...output power does not exceed the limit set force in relevant rules The violation of the rule could lead to serious federal penalty Instructions d installation professionnelle Veuillez noter que l appa...

Reviews: