
Pg 10 of 20
1-800-892-3986
IS2157
NOTE:
Make sure you are installing in a clean, dry and safe environment.
1.
Compress top of the unit against the ceiling in the desired location.
2.
Move the bottom end into place so that the unit is in a vertical position.
fig.1
tub ledge
(opening height)
fig. 2
shower stall floor
(opening height)
STEP 8