802700NZ - Commercial Installation Instructions - Aug 2015 - V2.01
Page 9 of 32
Technical Specifications
Product covered by these instructions:
Capacity
Boiling
(cups)
Capacity
Chilled
(glasses)
Boost
(10A)
GPO's
Required
Power
Rating
(kW)
Boost
Rating
(kW)
Unit Dimensions
W x D x H (mm)
with airduct
Dry
Weight
(Kg)
Boiling Only
B160
160
NA
no
1x10A
1.9
NA
280 x 313 x 335
8
B240
240
NA
yes
2x10A
1.9
2.2
280 x 313 x 335
8
Chilled Only
C125
NA
125
no
1x10A
0.175
NA
336 x 476 x 335
20
C175
NA
175
no
1x10A
0.300
NA
336 x 476 x 335
20
Chilled Sparkling
CS175
NA
175
no
1x10A
0.450
NA
336 x 476 x 335
26
Model
Cups of
Boiling
Water per
Hour
Glasses
of Chilled
Water per
Hour
B
160
NA
C
NA
125
1. The Cup measurement =167ml and the Glass measurement = 200ml
2.
Chilled water will continue to be dispensed after the rated capacity has been used, although this may be at
slightly higher temperature.
Commercial Models
B
B Mains Mixed water
C
C Mains Mixed water
CS
Chilled Spa Mains Mixed water
Before installing ensure the following are provided at the Installation site:
•
Review all the technical specifications.
•
Ensure the underbench can support the product weight when full of water
•
Sufficient space in the cupboard to install all of the undersink units in accordance with these Installation
Instructions. Refer to technical specification for dimensions. Refer to section 3 & 4, for Installation
instructions.
•
For all models, a 220-240Vac, 10A GPO will be required.
NOTE: Check all cable and hose lengths against inlet /outlet positions before
proceeding
(See section 4 for general layout).
•
A potable water supply connection with isolating valve inside the cupboard within reach of the braided
hoses and positioned so that the connection point and the stop cock will not be obstructed when the
undersink units are installed.
•
If an external filtration or water softening device is required, then it is important to allow extra space for
these items.
•
A cold water supply with a minimum working pressure of 172kPa (for B&C), 200kPa (with a Booster
and /or filter softener), 250kPa (for CS) and a maximum working pressure of 700kPa connected via an
isolation valve.
•
The appliance must be placed with it’s base in a horizontal position.
IMPORTANT!
Do not proceed with the Installation if these requirements are not met.