![Zell AC1000 Operation Manual Download Page 12](http://html1.mh-extra.com/html/zell/ac1000/ac1000_operation-manual_3314188012.webp)
11
6 First start-up
6.1 Setting up and switching on
220V or 110v Power supply must be firmly grounded
1. Drive the Air-Con Service Station to the workplace and lock the front
wheels.
Before operation the device must be on a level, flat surface so that
measurement can be made correctly.
2.
Plug in the Air-Con Service Station to the power mains.
3. Switch it on, the Air-Con Service Station comes to standby mode:
“Re f ri g e ra n t
** . * * KG ” de s c r ib e s th e qu a n t it y of re f ri g e ra n t ho l d in
wo rk in g ta n k .
No t e 1 : The highlight "H" on the lower right LCD corner is the prompt that means you can
long press
key to get the help information about the current operation.
No t e 2: if th e LC D sh o w be l l o w :
ZE L L
AI R C O N SE RV I C E STATI O N
Re f r i g e r a n t
** . * * KG
H
ERROR!
CODE:E00
ELECTRONIC SCALE FAULT
** . * *
ZERO BALANCE PLEASE!