background image

ZEITRAUM GmbH · Äußere Münchner Str.2 · D-82515 Wolfratshausen · Tel +49 (0)8171 - 418130 · Fax +49 (0)8171 - 418141 · [email protected] · www.zeitraum-moebel.de

YOMA

Assembly instructions 08/2018   

tools:

allen screw SW4 and SW5  (enclosed)

 

crosstip-screwdriver

8x Long steel debs   

 

 

4x wood debs 

 

 

 

12x XS steel debs    

 

 

24x Confirmat screws 

28x 

Boxes 

    

For Upholstery and Plate: 

28x grub screws 

 

 

 

10x Euro Screws (6x30)

1x Countersunk bolts (M8x50)   

 

10x Countersunk bolts (M6x20)

Scheulenburg setup video:

https://www.youtube.com/watch?v=ioIUTDqtvgE

2

4

5

6

7

3

1

2

4

5

6

7

3

1

2

4

5

6

7

3

1

2

4

5

6

7

3

1

2

4

5

6

7

3

1

2

4

5

6

7

3

1

1

 

Middle plank

Holding strips long side

3

 

Crossbars

Middle base

5

 

Screws and fittings

6

 

Headboard and base

7

 

Long sides 

2. 

Connect the two long sides with the crossbars(

3

). 

4. 

First put the boxes in their holes in the headboard and base of the bed (

6

), then the long steel 

debs. Fasten them with the grub screw like on the picture. Don´t tighten them too firmly. After put 

the wood debs in position and screw on the steel debs, on the sides and one in the middle.

3. 

Now fix the position by screw on all the grub screws in the 

crossbar. Don´t tighten them too firmly to make the further 

assembly more easy. 

1. 

Screw in the XS steel debs at the four positions of the 

crossbars in the long sides(

7

). Make sure the 

orientation of the 

debholes is vertical

, so later the grub screw take its effect. 

Also put in the boxes in the holes of the crossbars(

3

). 

Please do the setup of the bed 

on a soft surface(e.g. a carpet or blanket)

 to avoid damages.

Reviews: