SET-UP
Mechanical stage S mot. CAN
Carl Zeiss
General information
Measuring stage S mot. CAN
14
435465-9000-701
08/2012
3
SET-UP
3.1
General information
carefully prior to set-up and operation (see Section 1.2,
page 7).
The mechanical stage / measuring stage S mot. CAN is normally delivered together with the required
tools and optional accessories in several packages.
•
Remove all components from the packaging and check that all components described on the delivery
note are present.
•
Remove all shipping braces (adhesive tape or similar).
•
Keep the original packaging for storage or for returning the instrument to the manufacturer, or
dispose of it properly.
3.2
Mounting the mechanical /
measuring stage S mot. CAN
In the event that a microscope system
is not yet available or assembled, the
microscope must initially be installed
and put into operation according to
the separate operating manual. The
transillumination top 450 mot. may
already be mounted.
•
Switch off the microscope and illumination.
•
Remove the shipping screw (Fig. 2/
2
) on the
underside of the respective stage and keep it for
later use.
Only the measuring stage S mot. CAN
has a trigger socket (Fig. 2/
1
) on its
underside.
Fig. 2
Removing the transport locking screw