Start-up checklist
6-28
61211-1310402
CONTURA
Start-up checklist
Switching the CMM on
–
Has the CMM been switched on in the correct order?
➤
–
Power supply connected?
–
Control cabinet switched on?
–
Drives switched on?
–
Computer switched on?
–
Measuring software started?
Mounting the probe
–
Has the probe been secured on the ram with a screw? Torque: 2.2
Nm.
➤
Stylus system assembly
–
Have the criteria for the assembly been observed?
See operating instructions »Sensors«.
–
Have the limit values for the stylus system been observed?
See operating instructions »Sensors«.
Clamping the workpiece
–
Is the workpiece in the correct position?
➤
–
Is it possible to measure all workpiece dimensions in one cycle?
–
Is measurement possible without collision? A collision with the
changer rack, for example.
–
Has the workpiece been clamped properly?
Summary of Contents for CONTURA
Page 55: ...4 61211 1310402 CONTURA 4 1 Technical data This chapter contains CMM 4 2 Technical data...
Page 62: ...CMM 4 8 61211 1310402 CONTURA...
Page 68: ...Installation 5 6 61211 1310402 CONTURA...
Page 90: ...Setting up the workpiece 6 22 61211 1310402 CONTURA 200 100 100 200 100 600 Size 9 12 Z...
Page 91: ...Setting up the workpiece 61211 1310402 CONTURA 6 23 600 100 600 100 600 100 Size 9 18 Z...
Page 92: ...Setting up the workpiece 6 24 61211 1310402 CONTURA 600 100 600 100 800 100 Size 12 18 Z...
Page 122: ...Terminating the measuring operation 7 26 61211 1310402 CONTURA...
Page 130: ...Service features 8 8 61211 1310402 CONTURA...
Page 150: ...2Glossary 2 61211 1310402 CONTURA...
Page 156: ...6Alphabetic index 6 61211 1310402 CONTURA...
Page 157: ......
Page 158: ...CONTURA Operating instructions 2022 04 29 61211 1310402...