28 - EN
EN - 29
8.9 Procedure for ending the maintenance
1
During installation:
�
Set the unit in SERVICE MODE when the modulating by-pass valves
are blocking the installation of the heat exchanger;
�
Tighten all screws manually
(max. 1.5 Nm);
�
Place all cables in their guiding channels;
�
Place the bottom edge of the front behind the raised edge of the
bottom plate.
This will guarantee an air-tight seal after the screws are tightened.
Install all parts back in reverse order.
2
3
4
Example report
Connect the power to the unit.
Stop the SERVICE MODE.
(MENU > INSTALLER SETTINGS >
MAIN BOARD SETTINGS > SERVICE
MODE > ACTIVE MODE).
Fill in the maintenance log.
You can find the maintenance log in
the user manual.
Summary of Contents for ComfoAir Q
Page 1: ...Cooling Fresh Air Clean Air Heating Ventilation system Zehnder ComfoAir Q Installer manual...
Page 49: ......
Page 50: ......
Page 51: ......