I Installation report
Activity
Initials
Check the internal and external plating for damage.
Check the sealant beads for splitting.
Check if the doors/hatches are closed before starting.
Check the earthing is according to guidelines.
Check if the battery or batteries are connected correctly.
Check if the battery or batteries are not leaking.
Check the correct functioning of frost thermostat (if present).
Check the bent fins of the drip catcher (not shifted).
Check if the siphon(s ) are open and connected correctly.
Check if there are no obstacles or loose objects sitting in the unit.
Check the connection of the operating switch.
Check the lock of the operating switch.
II Maintenance log
2 or 3 months after installation:
Activity
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Check (flat)filter (pressure drop, damage and seal).
6 months after installation:
Activity
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Check (flat)filter (pressure drop, damage and seal).
Check the outdoor plating of the outdoor assembly
(soiling and damage).
Check the draught excluders (splitting).
Check the servo motors of the valves (functioning).
9 months after installation:
Activity
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Check (flat)filter (pressure drop, damage and seal).
12 months after installation:
Activity
Y1
Y2
Y3
Y4
Y5
Y6
Y7
Check (flat)filter (pressure drop, damage and seal).
Check the draught excluders (splitting).
Check the servo motors of the valves (functioning).
Check the fans (soiling and fixing vibration dampers).
Check the casing (soiling and damage).
Check the hinges/clamps (operation).
Check the valves (seals and bearings).
Check the battery or batteries (soiling and leakage).
Check the thermostat of the hot water battery
(functioning, soiling and leakage).
Check the leakage trays (soiling and functioning).
Check the drip collectors (soiling and functioning).
Check the plate exchanger (soiling).
Summary of Contents for ComfoAir Eco Series
Page 17: ...NL 17 Datum Activiteit Paraaf...
Page 32: ...32 EN Date Activity Initials...
Page 48: ...48 DE Datum Aktivit t Unterschrift...
Page 64: ...64 FR Date Activit Paraphe...
Page 80: ...80 IT Data Attivita Sigla...
Page 96: ...96 PL Data Czynno Podpis...
Page 97: ......
Page 98: ......
Page 99: ......