ZEBEX INDUSTRIES INC.
1
Subject
4
Version
=
Date
&
Page
Power Pack Software Utility Operation Manual
0.9.4
2008/6/1 18
/ 33
5. Change the running sequence of program:
Select the program which is desired to rearrange its running priority
sequence.
Click “
UP
”or “
Down
” button to adjust the running priority sequence.