Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
33/44
Figure 27 - Screen for setting the current limit
9)
Select the desired current limit. The following power limits can be set:
•
32A corresponds to the maximum limit of 7kW for single-phase and 22kW for three-phase;
•
16A corresponds to the limit of 3.5kW for single-phase and 11kW for three-phase;
•
10A corresponds to the limit of 2.3 kW for single-phase and 6.6kW for three-phase.
Wait for the device to restart automatically.
6.3.
Menu for repairs or maintenance
1)
From the screen shown in Figure 23, select item ‘2. Maintenance’ and press Confirm/Enter. Wait for
the screen shown in Figure 28 to appear.
Figure 28 - Maintenance screen
2)
Select '1. Restart' to restart the device manually. Confirm in the screen shown in
a)
b)
Current: 32A
10 A
16 A
1. Restart
2. Clear Log