Zaor Miza 88 Assembly Manual Download Page 6

10

Material used

-Melaminated chipboard 18+25 mm

 

solid wood (Oak or Ash;

 

PACKING LIST

 

44 

 

 

4

7

3

1

5

2

STEP 8

 Afterwards put bolts in part n 10 and carefully align all holes with

bolts, lower down and tighten with excenters.

STEP 9

drawer from the top down. During this phase avoid jamming the drawer and
never use force . You are done - Enjoy! When fully extracting the drawer, use
the fold down legs to stabilise.

Cleaning instructions

- clean with a soft, humid cloth or specific wood cleaners; -avoid the use of
abrasive materials or cleaners

;

We recommend being 2 people for assembly

Reviews: