_______________________________________________________________4. INSTALLATION
____________________________________________________________________________
10
CITIZEN 6 - 9/MC, CITIZEN 6+6 - 9+9/MC DIGITAL VERSION
4. INSTALLATION
ATTENTION: these installation instructions are for the
exclusive use of personnel qualified for the installation and
maintenance of electrical and gas equipment conceived for professional
use in the foodservice industry and community catering operations. An
installation carried out by unqualified persons could cause damage to
the oven, to people, animals or property.
ATTENTION: Proceed with the installation according to those
norms in force in the country where it is being carried out.
In addition, where it is necessary to carry out modifications or adaptations to
the electrical or gas systems of the building in which the oven will be
installed, whoever carries out such modifications must certify that the work
has been undertaken according to current “best practices”.
4.1 Checking on delivery
Unless otherwise agreed, the products are carefully packaged in a robust
structure in wood and with a sheet of nylon bubble wrap giving protection
against knocks and humidity during transport. These are consigned to the
freight operator in the best of condition.
We recommend, however, that you to check the packaging on arrival for
any signs of damage. If damage has occurred, have it noted on the receipt
which must be signed by the driver.
Once the equipment has been unpacked, check that it has not suffered
damage. Also check that all the dissembled parts are present.
In the event of damage to the equipment and/or missing parts, bear in mind
that the freight operator can only accept claims within 15 days of delivery and
that the manufacturer cannot be held responsible for damage incurred to its
products during their delivery. We are however, available to assist you in
presenting your claim.
In the event of damage do not try to use the equipment and
consult with professionally qualified personnel.