background image

VER. 001_02.10.2009

GUARANTEE CARD

There is 24 months guarantee on the product

Salesman stamp and signature, date of sale

1. ZMIE ZAMEL SP. J. assures 24 months guarantee for the product.

2. The manufacturer’s guarantee does not cover any of the following actions:

a) mechanical damage during transport, loading / unloading or under other circumstances,

b) damage caused by incorrect product mounting or misuse,

c) damage caused by unauthorised modifications made by the PURCHASER or any third parties to the product or any other devices 

needed for the product functioning, 

d)  damage caused by Act of God or any other incidents independent of the manufacturer.

3. The PURCHASER shall lay any claims in writing to the dealer or ZMIE ZAMEL SP. J.

4. ZMIE ZAMEL SP. J. is liable for processing any claim according to current Polish legislation.

5. ZMIE ZAMEL SP. J. shall process the claim at its own discretion: product repair, replacement  or money return. 

6. The manufacturer’s guarantee is valid in the Republic of Poland.

7. The PURCHASER’s  statutory rights in any applicable legislation whether against the retailer arising from the purchase contract or 

otherwise are not affected by this warranty.

MOUNTING

FUNCTIONING

1. Disconnect the power supply from the mains 

by the phase fuse, the circuit-breaker or the 

switch-disconnector  that  are  joined  to  the 

proper circuit,

2. Check if there is no voltage on connection 

cables by means of a special measure equ

-

ipment,

3. Install PCM-04 device in the switchboard on 

TH 35 DIN rail,

4. Connect the cables with the terminals accor

-

ding to installing diagram,

5. Switch on the power supply from the mains,

6. Choose  the  required  operating  mode  by 

MODE

 knob,

7. Adjust the time using the 

TIME

 and 

RANGE

 

knobs, where 

t=TIMExRANGE

.

DIMENSIONS

Power supply voltage release:

A

J

B

C

D E

F G

H

I

M

O

DE

U

A

t

t

SWITCH ON DELAY - after the supply voltage [U] has been applied the 

time measure t starts. After the time is over the relay switches on (pos. 

11-14). The next switch on interval appears after power supply voltage 

reset.

M

O

DE

A

J

B

C

D E

F G

H

I

U

t

t

B

SWITCH OFF DELAY - after the supply voltage [U] has been applied, the 

output relay [R] switches on immediately (pos.11-14), and the preset time 

[t] is measured. After the preset time [t] has been measured, the output 

relay [R] returns to the initial state (pos.11-12).

M

O

DE

A

J

B

C

D E

F G

H

I

U

t

t

t

t

t

t

C

FLASHER STARTING WITH OFF - (Starting from the switch off position). 

After the supply voltage [U] has been applied, the preset time [t] measurement 

starts. After the time [t] is over, the relay switches on (pos.11-14) and the pre

-

set time [t] is measured once more. After the preset time [t] is over, the output 

relay [R] returns to the initial state (pos.11-12), and the next operating cycle of 

the relay starts. The relay operates until the supply voltage is removed.

M

O

DE

A

J

B

C

D

E

F G

H

I

U

t

t

t

t

t

D

t

FLASHER STARTING WITH ON - (Starting from the switch off position). After 

the supply voltage [U] has been applied, the relay is switched on immediately 

(pos.11-14) and the preset time [t] measurement starts. After the time [t] is 

over, the relay switches off (pos.11-12) and the preset time [t] is measured 

once more. After the preset time [t] is over, the output relay [R] returns to the 

initial state, and the next operating cycle of the relay starts. The relay operates 

until the supply voltage is removed.

A

J

B

C

D

E

F G

H

I

M

O

DE

E

U

0.5s

t

0.5s

t

DELAY IMPULSE GENERATION 0,5 s - after the supply voltage [U] has 

been applied the time measure t starts. After the time is over the relay swit

-

ches on (pos. 11-14) for 0,5s, next the relay is switched off (pos.11-12). The 

next switch on interval appears after power supply voltage reset.T.

External signal release:

A

J

B

C

D E

F

G

H

I

M

O

DE

S

F

t

t

GROWING MODULATED VOLTAGE VALUE – after the impulse release 

has been applied to the powered system (growing value) it switches on 

the relay (pos. 11-14), and starts to measure the preset time. After the 

time t is over the relay switches off (pos.11-12). Impulse time duration is 

not important here (pos.11-12).

A

J

B

C

D E

F

G

H

I

M

O

DE

S

t

t

G

FALLING MODULATED VOLTAGE VALUE - powered system switches 

on the relay after impulse release fades (pos. 11-14) and time measu

-

rement starts. The relay is switched off after time t is finished. The follo

-

wing time release fades during time measurement does not cause time 

measure from the beginning (no retriggerable).

A

J

B

C

D E

F G

H

I

M

O

DE

S

t

t

H

t

t

t

SWTCH ON/OFF DELAY - after the impulse release has been applied to 

the powered system (growing value) let the relay be switched off (pos.11-

12), the same, starts the preset time t measurement. After the time is 

over the relay is switched on (pos. 11-14). After the impulse release fade 

is detected (falling modulated voltage), the system starts preset time me

-

asurement again after it is finished the relay is switched off (pos.11-12). 

In  case  impulse  duration  is  longer  than  the  preset  time  t  the  relay  is 

switched on for the t time only.

A

J

B

C

D E

F G

H

I

M

O

DE

S

t

t

I

t

BISTABLE RELAY WITH TIME LIMIT - after the impulse release has been 

applied to the powered system (growing value) it switches on the relay 

(pos. 11-14), and starts to measure the preset time. The relay is switched 

off during the next impulse release (growing modulated voltage) or after 

time t is over if there was no such impulse occurence. Impulse time dura

-

tion is not important for system operating.

A

J

B

C

D E

F G

H

I

M

O

DE

S

J

t

t

t

t

t

GROWING MODULATED VOLTAGE VALUE WITH SWTCH OFF DELAY 

(RETRIGGERABLE) - after the impulse release has been applied to the 

powered system (growing value) it switches on the relay (pos. 11-14). After 

the impulse release fade is detected (falling modulated voltage), the system 

starts preset time measurement again and when it is finished the relay is 

switched off (pos.11-12). In case impulse duration is longer than the preset 

time t the relay is switched on for the t time only.

U

Diodes’ function

description

Time adjustment example 

t

Relay turned off

 

time not counted down

1

10

5 6

7

8

9

2

3

4

TI

ME

0,1s

OFF

1s

10s

1min

10min 1h 10h

1d

ON

RA

N

G

E

TIME

x

RANGE

,

t = 8 x 1 d = 8 d

☼ Relay turned on

 

time not counted down

TI

ME

1

10

5 6

7

8

9

2

3

4

0,1s

OFF

1s

10s

1min

10min

1h

10h

1d

ON

RA

N

G

E

TIME

x

RANGE

,

t = 3 x 1 h = 3 h

☼ Relay turned off

 

time counted down

☼ Relay turned on

 

time counted down

CONNECTING

14

11 12

ATTENTION! 

The  release 

impulse  can 

by  a  signal  from  L  or  N  line.  The  operating 

mode  change  (in  any  moment)  causes  an 

immediate zeroing of the measured time and 

starting the new chosen operating mode. Time 

adjustment  choices  are  made  without  delay.

Reviews: