
DP-2010FKNX Version 09242003
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
11
8.4 Turn mode switch 1 to on.
8.5 Turn mode switch 2 to on.
8.6 Turn mode switch 3 to on.
8.7 Turn mode switch 4 to off.
8.8 Press the test button once to initiate the timer
sequence.
8.3 Adjust the pump volume adjustment knob to
the value used in the calculations in step 8.1.
Number of turns open on the pump volume knob
3
6
12
Sample pump displacement per stroke
.1cc
.2cc
.4cc
5[UVGO
/WVWCN
4463:/.
(CEVQT[
8. Sampler Set-Up - Time-based sampling