YYZ Lighting Inc., 1175 Squires Beach Rd, Unit 2, Pickering, ON L1W 3V3, Canada. www.yyzlighting.com
Page 2 of 2
INSTALLATION INSTRUCTION
Please refer to the installation guide and use accessories only that accompanies the product. The Warranty will
not be effective subject to the condition when the products are used with other materials which is not specified
by the installation guide.
3/8 Cap Nut
: 4EA
1
3
2
M10 Washer(Ø26)
: 4EA
3/8 Nut
: 4EA
3
2
30mm
Please secure the vertical mounting position
that the pole will not be inclined.
BCN Series
1
All wires and connections should be checked thoroughly and protected
against water immersion or moisture ingress with suitable tapes and
sealants, potting compounds.
BEACON BOLLARD
INSTALLATION
BCN-BL