At the controller, in the Fault Table, the User is expected to ‘Acknowledge’ the change in Node
and then press the L3 button to confirm. Note: The use of the ‘Release’ Button is not required.
Figure 105. Node Replacement Acknowledge Message
10.5.4. Replacement of a Smartloop.
To replace a Smartloop, disconnect the unit from the RAG Node from which it is spurred by
disconnection at the PTB (see section
Note:
Smartloops are not connected to the Plus+ network via a Bypass module. During replacement
of a Smartloop, communications to any Smartloops connected via the replaced Smartloop will
be disrupted.
Once disconnected at the PTB, the Smartloop connections to the Plus+ network cable and the loop
feeder/tails cable can be cut as near to the respective torpedo resin joints as is practicable.
For a single Node, the process to acknowledge an update does not require prior knowledge of the
Serial Number. However, it is good practice to note the New Serial Number and update any backups
of the Design Layout (paper or Electronic). i.e. tack a photo of the QR code serial number If multiple
nodes are being replaced, then the Serial Number will need to be noted for configuration update. i.e.
tack a photo of the QR code serial numbers and note their respective locations
Connect the replacement Smartloop to the loop feeder/tails cable. See section
See section
Smartloop Installation Verification
for instructions on confirming the correct
installation and configuration of the replacement Smartloop device in combination with the loop.
Connect the replacement Smartloop to the Plus+ network cable. See section
Reconnect the Smartloop connection to the RAG Node from which it is to be spurred at the PTB.
At the controller, in the Fault Table, the User is expected to ‘Acknowledge’ the change in Node and then
press the L3 button to confirm. Note: The use of the ‘Release’ Button is not required.