0 8
y t
HANDLEBAR ASSEMBLY
PRO // COMP
E13 PLUS // E13 BASE
Remove the cable ties using a wire cutter.
Remove the stem screws and put them aside
(T25 Torx).
Install the handlebar. Mount the handlebar to
the stem.
Start with the uppermost bolts, torqueing
down the top part of the stem clamps ac-
cording to the manufacturer’s specifications.
Take care not to leave a gap here (zero gap).
Only then should you secure the handlebar
with the lower bolts as well.
Make sure that the clamp gaps under the low-
er stem bolts are even, and that the handlebar
is correctly centered and aligned in the stem
– there are markings to assist you with this.
Torque all bolts precisely to the spec indicated
by the stem and/or handlebar manufacturer.
E13 Plus:
Steerer tube screws //
5 – 7 Nm
Handlebar clamp screws //
5 – 7 Nm
E13 Base:
Steerer tube screws //
5 – 7 Nm
Handlebar clamp screws //
5 – 7 Nm
2.2.1
2.2.4
2.2.2
2.2.3
Please follow the
torque specifications of
the manufacturers: