6
8. Mount channels to upper collector mounting assembly using supplied hardware.
9. Temporarily attach upper pads to the channels and (with some assistance) lift the
collector(s) up into position.
9. Set angle of the collectors by the length of the channel.
10. Locate the placement of the upper pads by ensuring that the struts are
perpendicular to the roof surface. Mount pads to roof repeating steps 3-5.
ADJUST ANGLE
FOR INSTALLED
LOCATION