Assembly
1.8m Platform Height
Insert castor into adaptor
or adjustable leg and then
into base of frame.
Unfold base unit, insert
ocking pin, and locate deck
on 2nd rung of the tower.
Lock castors and
level base.
Insert 2 x
guardrail
frames.
Move deck to 7th rung of
tower.
Fit 4 x stabilisers *
Fit 4 x horizontals as
guardrails (3T method) on the
9th and 11th rungs.
Fit diagonal brace (blue)
on the front of the tower, from
the 4th to the 8th rung.
Fit toeboards. The Tower
is now complete.
* Stabilisers are not required
if tower is being used
internally at this deck height.
2.55m Platform Height
Insert castor into adaptor
or adjustable leg and then
into base of frame.
Unfold base unit, insert
locking pin. Fit horizontal
brace to 1st rung of open
side of base unit. Lock
castors and level base.
Insert
deck on
2nd rung
of tower.
Insert 2 x lift frames.
Fit diagonal brace (blue)
on front of tower, between the
4th and 8th rungs.
Insert deck on
10th rung.
Fit 4 x stabilisers.
Fit 4 x horizontal
braces (red) as
guardrails
(3T method)
on the 12th and
14th rungs.
Fit diagonal
brace (blue)
on the front of
the tower, between
the 10th and
14th rungs.
Fit toeboards.
The Tower is now
complete.
BOSS ROOM-MA
TE Quantity S
chedule
Code
Description
W
eight
(WH)
2.80m
3.80m
4.55m
5.55m
6.30m
8.20m
(kgs)
(PH) 0.80m
1.80m
2.55m
3.55m
4.30m
6.05m
No. of rungs to platform
3
7
10
14
17
24
Height 1
Height
2
Height 3
Height 4
Height 5
Height 6
333513
125mm Castor
2.50
4
4
4
4
4
4
324413
Castor
Adaptor*
0.21
4
4
4
4
4
4
*When used on uneven ground and adjustment is required, 4 adjustable legs may be used which replace the castor adaptors.
301514
Base Unit
21.43
1
1
1
1
1
1
302514
7 Rung Lift Frame
9.80
2
2
4
6
303514
4 Rung Guardrail Frame
5.60
2
2
30451
1
1.8m T
rapdoor Deck
14.35
1
1
2
2
3
4
312513
1.8m Horizontal Brace (red)
1.88
3
4
7
9
9
13
313513
2.1m Diagonal Brace (blue)
2.06
1
2
4
4
6
304514
Toeboard Set
10.00
1
1
1
1
1
317513
SP7 Fixed Stabiliser
5.80
4*
4
4
318513
SP10
Adjustable Stabiliser
9.87
4
4
* SP7 Stabiliser only required when ROOM-MA
TE is used externally
.
Assembly
When erecting a BoSS Room-Mate:
To comply with the Work at Height Regulations, guardrails are
positioned in advance of climbing onto a platform to reduce the
risk of a fall.
All platforms feature double guardrails on both faces of the
tower.
All guardrails should be 2 and 4 rungs (0.5m and 1.0m) above
platforms.
Position handrails 4 rungs above platform level.
Position intermediate handrails 2 rungs above platform level.
Never stand on an unguarded platform
positioned above the second rung of
a tower. If your risk assessment shows
it necessary you may also need to
guardrail platforms at this level.
To dismantle a BoSS Room-Mate:
Remove toeboards, and pass down the tower.
Unclip farthest end of braces and immediately go to protected
trapdoor position on ladder to complete removal.
Remove upper platforms from protected platform levels below.
Pass removed components out of the tower to a colleague.
0.8m Platform Height
Insert castor into adaptor or adjustable
leg and then into base of frame.
Unfold base unit, insert locking pin.
Lock castors and level base.
Insert deck on 3rd rung of tower.
Fit horizontal braces (red) as guardrails,
on the 5th and 7th rungs.
The Tower is now complete.
(WH) = W
orking Height (PH) = Platform Height
3
4
5
2
1
3
4
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
5