background image

Assembly

1.8m Platform Height

Insert castor into adaptor 

or adjustable leg and then 
into base of  frame.

Unfold base unit, insert 

ocking pin, and locate deck 
on 2nd rung of  the tower. 
Lock castors and 
level base.

Insert 2 x 

guardrail 
frames.

Move deck to 7th rung of  

tower.

Fit 4 x stabilisers *

Fit 4 x horizontals as 

guardrails (3T method) on the 
9th and 11th rungs.

Fit diagonal brace (blue) 

on the front of  the tower, from 
the 4th to the 8th rung.

Fit toeboards. The Tower 

is now complete.
* Stabilisers are not required 
if  tower is being used 
internally at this deck height.

2.55m Platform Height

Insert castor into adaptor 

or adjustable leg and then 
into base of  frame.

Unfold base unit, insert 

locking pin. Fit horizontal 
brace to 1st rung of  open 
side of  base unit. Lock 
castors and level base.

Insert 

deck on 
2nd rung 
of  tower.

Insert 2 x lift frames.

Fit diagonal brace (blue) 

on front of  tower, between the 
4th and 8th rungs. 

Insert deck on 

10th rung.

Fit 4 x stabilisers.

Fit 4 x horizontal 

braces (red) as 
guardrails 
(3T method) 
on the 12th and 
14th rungs.

Fit diagonal 

brace (blue) 
on the front of  
the tower, between
the 10th and 
14th rungs.

Fit toeboards.

The Tower is now
complete.

BOSS ROOM-MA

TE Quantity S

chedule

Code 

Description 

W

eight 

(WH) 

2.80m 

3.80m 

4.55m 

5.55m 

6.30m 

8.20m

(kgs) 

(PH) 0.80m 

1.80m 

2.55m 

3.55m 

4.30m 

6.05m

No. of rungs to platform 

10 

14 

17 

24

Height 1 

Height 

Height 3 

Height 4 

Height 5 

Height 6

333513 

125mm Castor 

2.50 

4

 4

 4

 4

 4

 4

324413 

Castor 

Adaptor* 

 

0.21

 

4

4

*When used on uneven ground and adjustment is required, 4 adjustable legs may be used which replace the castor adaptors.

301514 

Base Unit 

21.43 

1

302514 

7 Rung Lift Frame 

9.80 

6

303514 

4 Rung Guardrail Frame 

5.60 

2

2

30451

1.8m T

rapdoor Deck 

14.35 

4

312513 

1.8m Horizontal Brace (red) 

1.88 

13

313513 

2.1m Diagonal Brace (blue) 

2.06 

4

 4 

6

304514 

Toeboard Set 

10.00 

1

317513 

SP7 Fixed Stabiliser 

5.80 

4* 

4

318513 

SP10 

Adjustable Stabiliser 

9.87 

4

* SP7 Stabiliser only required when ROOM-MA

TE is used externally

.

Assembly

When erecting a BoSS Room-Mate:

To comply with the Work at Height Regulations, guardrails are 

positioned in advance of  climbing onto a platform to reduce the 
risk of  a fall.

All platforms feature double guardrails on both faces of  the 

tower.

All guardrails should be 2 and 4 rungs (0.5m and 1.0m) above 

platforms.
Position handrails 4 rungs above platform level.
Position intermediate handrails 2 rungs above platform level.

Never stand on an unguarded platform 

positioned above the second rung of  
a tower. If  your risk assessment shows 
it necessary you may also need to 
guardrail platforms at this level.

To dismantle a BoSS Room-Mate:

Remove toeboards, and pass down the tower.
Unclip farthest end of  braces and immediately go to protected 

trapdoor position on ladder to complete removal.

Remove upper platforms from protected platform levels below.
Pass removed components out of  the tower to a colleague.

0.8m Platform Height

Insert castor into adaptor or adjustable 

leg and then into base of  frame.

Unfold base unit, insert locking pin. 

Lock castors and level base.

Insert deck on 3rd rung of  tower.

Fit horizontal braces (red) as guardrails, 

on the 5th and 7th rungs.

The Tower is now complete.

(WH) = W

orking Height  (PH) = Platform Height

3

4

5

2

1

3

4

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7
8

9

10

5

Reviews: