![Yotta 3 SAS User Manual Download Page 38](http://html1.mh-extra.com/html/yotta/3-sas/3-sas_user-manual_3520999038.webp)
Hardware Operation Manual
38
Step 2 : Install Clip nuts
Attach M5 clip nut on each side of the front rack posts.
Clip nuts use the figure 2 below to locate the clip
nuts.
Note:
These clip nuts will be used to secure the subsystem through its front ears
as will be discussed in Step 4.
Figure 2: Attach the clip nuts to the rack posts
Summary of Contents for 3 SAS
Page 1: ...Yotta 3 SAS SATA JBOD Enclosure User Guide Ver 1 0...
Page 13: ...Hardware Operation Manual 13 Y3 16S6JS6 Y3 12S6JS6...
Page 15: ...Hardware Operation Manual 15 Y3 12S6JS6 D...
Page 43: ...Hardware Operation Manual 43 One SAS Raid subsystem with one SAS JBOD Tower...
Page 44: ...Hardware Operation Manual 44 One SAS Raid subsystem with two SAS JBOD Tower IN OUT OUT...
Page 45: ...Hardware Operation Manual 45 One SAS Raid subsystem with three SAS JBOD Tower IN OUT OUT...
Page 46: ...Hardware Operation Manual 46 One SAS Raid subsystem with four SAS JBOD Tower IN OUT OUT...