![Yoshitake GP-1200 Installation And Operation Manual Download Page 13](http://html1.mh-extra.com/html/yoshitake/gp-1200/gp-1200_installation-and-operation-manual_914658013.webp)
■
EPDT-101
■
‑12‑
8.5 Exploded drawing
Parts with in the flame are consumable. Please contact us for purchase of these consumable parts.
№
Name of parts
Replace period
5
Diaphragm
2 years
14
Piston ring
3 years
15
Inner ring
3 years
17
・
18
Pilot valve assembly
5 years
22
Gasket
5 years
24
・
25
Gasket
2 years
26
Strainer
5 years
28
Gasket
2 years
8
Pilot diaphragm
2 years
Note (*): Apply a liquid sealant for heat and steam resistant (Recommendation: NEVER
SEEZ Standard grade) to the sealing surface of the diaphragm bottom and the top
cover, and pilot diaphragm top and the cover.