1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
K
K
J
J
I
I
H
H
G
G
F
F
E
E
D
D
C
C
B
B
A
A
Assembly Documentation
Section:
Product(s):
Assembly.SchDoc
M1806
3
3
Sheet
Of
PCB#:
Rev#:
Modified:
V03
File:
2019-05-23
SA315S
EML Rev#:
01
Tmp Date:
PCB ASSEMBLY DOCUMENTATION
MOUNTING HARDWARE FOR Q203/Q205:
TOP VIEW:
BOTTOM VIEW:
YS#: 8701
DESC: 4-40 KEPS NUT
1. Bend leads on hand placed parts in direction of pad and cut short to less than length of pad.
No exceptions unless approved by Production Engineering.
2. Any clinch parts with longer leads than the length of the pad must be cut shorter either prior to
wave-soldering or afterwards in PCB finishing. No exceptions unless approved by Production Engineering.
3. After Wave apply RTV to all holes indicated and all larger and between tall capacitors.
4. Before tightening screw 8832 on xstr spring 4249 ensure that it is aligned with Q4.
Also silpad 4124 should overhang the edge of the heatsink. See picture below.
RTV INSTRUCTIONS:
ADD RTV BETWEEN:
C12, C13, C14, AND C15 AFTER WAVE
SOLDER
ADD RTV
YS#: Z1740
DESC: HEAT SPREADER
YS#: 8832
DESC: 6-32X1/4 PAN TAPTITE
Q4
YS#: 4249
YS#: 4124
DESC: 1.1x0.82" SIL PAD
Q205
Q203
ADD GOOP ON BOTH SIDES OF CERAMIC INSULATORS
YS#: 4233
DESC: CERAMIC INSULATOR
IMPORTANT!
YS#: 8902
DESC: 4-40X3/4 PAN
YS#: 8485
DESC: #6 ZINC WASHER
YS#: 8800
DESC: #6 KEPS NUT
YS#:8761
DESC: #6-32X1/2"
YS#: 8742
DESC: #4-40X3/8
1st HEATSINK ALIGNMENT SCREW
GENERAL ASSEMBLY INSTRUCTIONS
1. First install #8742 screw to align heatspreader Z1740
2. Install all devices, shown in pictures below, on Heat Spreader
MOUNTING HARDWARE INSTRUCTIONS FOR HEAT SPREADER Z1740:
Ensure that all fastener nubs on tie wraps
are well below the top of the coil.
Top of Coil L200
DESC: XSTR SPRING
OVERHANG SILPAD
SEE NOTE 4.
Summary of Contents for Synergy SA315S
Page 36: ...15uH...