1.6 Measurements, clearances and accesses
1.6.1 Clearances
When installing each unit, clearances should be left for:
1 Air inlet and discharge.
2 Maintenance servicing.
3 Power supply connections.
To operate correctly, all minimum clearances shown on the general dimension diagrams should be re‐
spected, with regard to the possible obstruction of air circulation or of the work of an operator.
Minimum technical clearance YLCA 5, 7, 9, 12 and 15
600
300
800
150
400
N O T E
Distances in millimetres
1
Installation manual
1.6
Measurements, clearances and accesses
18
Summary of Contents for Ylca 12
Page 4: ...1 Installation manual...
Page 40: ...2 Electric circuit diagrams...