A
B
C
D
E
F
G
H
I
J
K
L M N P
45~80C(A/B)15A
Model(YDS)
Panel installatio n
22~36C(A/B)15A
90~140C(A/B)15A
Duct Connection
The length of the duct should according to the static pressure outside the unit 39.2Pa
(max. 98Pa
)
.
5
Hang the belt on the hook of the main body .
3. Fix the outside frame and the canvas duct with screws.
Screw must be fixed from the bottom to the top.
1. Unload the inner frame.
Slide the knob, release the
buckle from the outside frame hole, then unload the inner
frame.
2. Hang the outside frame on the main body with face down. (4 places at 4 corners).
Note :
The signal wire of the remote control receiver must be drawn out through the canvas
duct.
Main body
Waist-shaped hole
fixed board
C anvas duct
C eiling
O utside frame
O utside frame
H ook
G allus
Inside frame
Knob
Buckle
Outside frame
S crew
C eiling
Canvas duct
Canvas duct
C eiling
O utside frame
Duct
Main body
4. Hang up the outside frame until it sticks to the ceiling tightly.
Summary of Contents for YDDN-112C(A/B) 15A
Page 2: ... 8 8 1 8 8 13 8 1 3 5 ...
Page 3: ... 8 A 1 3 0 8 899 B 19 8 899 ...
Page 4: ... 89 8 C 1 3 A D B 56E69 ...
Page 5: ... 8 1 FG BH 0 8 1 A 5 299 B A 646 ...
Page 8: ... 3 4 597 A A 819 B ...